Re: Lophonie - The complete overhaul starts....
Update:
Hey Guys, Its been so long since an update has been made, Since christmas break i feel we've accomplished alot of things, some bigger jobs and alot of smaller jobs. Heres some new photos of things we've built and thins we've accomplished.
My new power steering cooler and engine coolent overflow bottle.
I dont know if this was a factory piece but when i purchased my 92' ty this came with it, after repainting the claddin we never reinstalled it so i figured why not see how it looks this. with the truck off the hoist the scoop sits about 3 inches off the ground:lol: I think a more durable and stronger steel scoop will need to be made but this will do for now.
What took up most of our time was making the DP and Exhuast, My father and I had never really done any thing like this so we took our time and i think it turned out pretty nice! We put in a spot for the wideband aswell.
After everything was perfect we did a final install and then the DP was wrapped and reinstalled. The exhaust was then welded into place.
New Lokar billet Dipstick.
I've always wanted to but the battery in the back of the truck inside so a Taylor Aluminum Battery Box was purchased as well as a Battery Cable Kit.
I Had to run to town to get a few things for the truck but, the battery/ box should be installed for the last time today as well as im hoping to get the majortiy of the interior in today. Ill try and update this week of what we accomplaish today and tomorrow.