Project Towel Head Habib

TYTILIDIE

METH HEAD
This POS is now cluttering my driveway because the owner is too lazy to put it together himself.

Abe (Turbotyphoon69), is Afghani so I had to give him some shit. Here is the truck, it is a super nice truck, especially in person. The goal is to get it to run in the low 12's, personally I would like to see it hit 11's but we'll see. The plans are:
Stock motor
75#ers
Stealth 70
Headers
FMIC and tuning. We know were not getting 11's on the stock motor and I personally don't like the idea of running this turbo on the stocker. This is why we went ahead and ordered a turbo oil filter. Here are some before pics of the truck, I'll take more as they progress

Here's the engine bay all ripped up


Here is the turbo that arrived today


Tomorrow I will hook up the oil and drain lines. After that I have to make some braces to support the turbo to TRY and avoid cracking the headers.

THANK YOU COME AGAIN!!! :rotf:
 
Last edited:

Ry368

one mile = 5280 feet
Re: Project Towel Head Habib

Crack the phuckin whip Mike and take away his Slurpee!!!!;)
 

AUSyTyIN

Unbusted $#it box
Re: Project Towel Head Habib

:rotf:

If you guys knew Abe, this would be hilarious. Habib's gonna be pissed...:lol:
 

TYTILIDIE

METH HEAD
Re: Project Towel Head Habib

Finally got this thing moving again. Got the headers installed, what a PITA!!


Turbo as well


Also got to work on the FMIC, seemed a little easier than when I did mine. Mine took almost a whole weekend just to mount it, cut core away, I spent a few hours on this one.

I also got the radiator and E-fan back in
 

TYTILIDIE

METH HEAD
Re: Project Towel Head Habib

I will drop the IC piping off tomorrow to get welded up Hopefully it wont take a week like mine did. After that it will be ready for injectors and tuning equipment.
 

WyoSyclone

Active member
Re: Project Towel Head Habib

Hey Im not racist I think everybody should own one:lol:

I researched this..... technically, their headwear is actually a type of little sheet.... so, from now on I use the more politically correct term... "Little Sheet Heads". :D
 

turbotyphoon69

New member
Re: Project Towel Head Habib

Mike the injectors will be sent soon, I am sending the payment 1 day air.

WyoSyclone, Ill be up there hunting antelope in two weeks and possibly deer and elk when I am done hunting here in Co, ill make sure to find you and show you my sheet.
 

WyoSyclone

Active member
Re: Project Towel Head Habib

Mike the injectors will be sent soon, I am sending the payment 1 day air.

WyoSyclone, Ill be up there hunting antelope in two weeks and possibly deer and elk when I am done hunting here in Co, ill make sure to find you and show you my sheet.

Cool.... come on by.. it would be nice to have a fellow SyTyer to visit with.... we have some awesome hunting up this way.... shoot me a PM if you think you can make it this far North.... :D
 

TYTILIDIE

METH HEAD
Re: Project Towel Head Habib

Made some decent progress today. Only a couple hours but at least I got something done. We got the gauges in and I installed them in to the pod. We got Fuel Pressure on top then Boost and then AFR. They are the C2 gauges since he has the Speed Hut blue dash. Then we got him the blue Innovative gauge for the LC-1.


Here is the mess of wiring to install the wideband and gauge and a few otehr things going on like the Greddy Profec Spec II


Then outside I installed the 75#ers but couldn't get the rail to seat properly so I took it off



Cleaned up some wiring and vacuum crap "while I was in there" too. There is going to be a lot of while youre at it stuff to this project.
So what I did here was bless Abe with my glorious used modified Ty rails:lol:


All I have to do is get a new ferrule (sp?) for the front look and it's good to go for fuel. One thing that kind of bites is that I noticed in the old rail that there were a few o-rings in there causing it not to seat:oops: Oh well, I like this idea better anyway. Tomorrow I am going to try and tidy up the wiring in the cab. We just really need the alky kit to make it finalized inside the truck. All the ECM wideband integration is a done deal, took me all of 20 minutes. I know when I did it on my Ty I spent about two hours and I did this one in the dark with a flashlight in my mouth. I am hoping to get everything in the engine bay done by this weekend so we can move on to the next round of parts.
 

TYTILIDIE

METH HEAD
Re: Project Towel Head Habib

Made a little more progress today. Got the fuel rails completed by installing the loop and fuel pressure sending unit

Got the IC piping out of the way as well


Installed the EBC solenoid and wired it all up as well.
 
Top