canadian
sy in progress
Ok, I've seen multiple installs and have been searching here for the past few days but haven't found exactly what I'm looking for. What I'd like to do is move the battery to the rear of my Syclone and have a few questions I need to get answered.
In the past I've had both the ATR and KB relocation kits. They basically move the battery, but still tie into the existing wiring under the hood so that you don't have to do anything really difficult when installing, but then they aren't NHRA legal (not that this is extremely important to me). I understand the NHRA requirements for shut offs and that it must kill the truck completely.
There are a few threads of how people have wired it (to the coil, to the alternator field, to the ECM B fuse).
The root of the question is wiring from the rear to the front. I've seen two different ways of wiring things.
1) Use a single large cable from the rear of the truck to the front, like this:
2) Run a large cable to the starter, then run a 2 gauge cable back from the alternator to the battery, like this:
Neither the KB, nor the ATR kit run an additional wire back to the battery. The ATR kit just lengthens the cables, whereas the KB kit runs to binding posts up front and that's how the charge gets back to the battery.
What I was thinking of doing is:
1) Relocate battery to rear frame rail
2) Ground from battery to frame with 1/0 cable
3) Run positive to breaker on frame (within 18" of battery)
4) Run from breaker to flaming river cut off switch
5) Run from flaming river switch to post on starter
Now this is where I get cloudy. Can I run from the alternator to the same post on the starter so that the alternator can charge the battery? Then I'd run wires up to a relay to be able to cut power to either the ECM or the brown wire on the alternator.
I'd like to avoid having to run both a 1/0 and 2 gauge wire from the back to the front of the truck. The other option is to purchase some binding posts and mount them under the hood, then run switch to binding post, binding post to starter, and alternator to binding post. That may be the best way to do it. Then I'd have a spot to jump start under the hood.
Anybody have detailed pics of their installs? I supposed I could skip the cut off switch all together as I've seen others race at the track with a relocated battery but no switch.
In the past I've had both the ATR and KB relocation kits. They basically move the battery, but still tie into the existing wiring under the hood so that you don't have to do anything really difficult when installing, but then they aren't NHRA legal (not that this is extremely important to me). I understand the NHRA requirements for shut offs and that it must kill the truck completely.
There are a few threads of how people have wired it (to the coil, to the alternator field, to the ECM B fuse).
The root of the question is wiring from the rear to the front. I've seen two different ways of wiring things.
1) Use a single large cable from the rear of the truck to the front, like this:
2) Run a large cable to the starter, then run a 2 gauge cable back from the alternator to the battery, like this:
Neither the KB, nor the ATR kit run an additional wire back to the battery. The ATR kit just lengthens the cables, whereas the KB kit runs to binding posts up front and that's how the charge gets back to the battery.
What I was thinking of doing is:
1) Relocate battery to rear frame rail
2) Ground from battery to frame with 1/0 cable
3) Run positive to breaker on frame (within 18" of battery)
4) Run from breaker to flaming river cut off switch
5) Run from flaming river switch to post on starter
Now this is where I get cloudy. Can I run from the alternator to the same post on the starter so that the alternator can charge the battery? Then I'd run wires up to a relay to be able to cut power to either the ECM or the brown wire on the alternator.
I'd like to avoid having to run both a 1/0 and 2 gauge wire from the back to the front of the truck. The other option is to purchase some binding posts and mount them under the hood, then run switch to binding post, binding post to starter, and alternator to binding post. That may be the best way to do it. Then I'd have a spot to jump start under the hood.
Anybody have detailed pics of their installs? I supposed I could skip the cut off switch all together as I've seen others race at the track with a relocated battery but no switch.