Injected1
Member
This was the longest wait ever. Supposed to be gone 1wk but actually took a month.
Before::Renz upper
Willwood
After::
Willwood and valve covers
Hats off to RenzFAB for building an amazing piece. Just wish he'd build more!! LOL
Ramon thanks for the polishing
I Can't wait to install it.
Thanks, Nick
Before::Renz upper
Willwood
After::
Willwood and valve covers
Hats off to RenzFAB for building an amazing piece. Just wish he'd build more!! LOL
Ramon thanks for the polishing
I Can't wait to install it.
Thanks, Nick
Last edited: